Construction of Four Lane RCC Box Girder Bridge Over Mahakali River (800m) with Six lane 7.8 Km Road, Dodhara, Kanchanpur,

Construction of Four Lane RCC Box Girder Bridge Over Mahakali River (800m) with Six lane 7.8 Km Road, Dodhara, Kanchanpur,

The work consists of   -construction of 800m four lane PSC Box Girder Bridge (800m 2*2 Lane Twin bridge, No of span 2*16 span, each span 50m), Total Width of Bridge: 23.87m - Construction of 7.8 Km six lane road works including earthen embankment (Four lane Asphalt Road with 22.5m formation width and two lane gravel service road -Construction of 30m four lane PSC Girder Bridge (30m 2*2 lane twin bridge) over Bhujela River -30m Four lane PSC Girder Bridge (30m 2*2 lane twin Bridge) over Gaddachauki canal

 

The Employer is:

GON, Ministry of Physical Infrastructure & Transport, Department of Roads, Road Improvement and Development Project Directorate, Mahakali Bridge Project, Mahendranagar, Kanchanpur

Project Hightlight

Construction of Four Lane RCC Box Girder Bridge Over Mahakali River (800m) with Six lane 7.8 Km Road, Dodhara, Kanchanpur,
  • Roads and Bridges
  • RIP/3371334/MBP-01/073/74
  • NPR 3,660,590,834.16
  • Prime
Construction of Four Lane RCC Box Girder Bridge Over Mahakali River (800m) with Six lane 7.8 Km Road, Dodhara, Kanchanpur,