Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works, Ch: 49+800 to Ch: 57+400

Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works, Ch: 49+800 to Ch: 57+400

This is a national pride project. The project work starts at chainage 49+800 and ends at chainage 57+400. The total length of the work is 7.60 Km. This contract area lies in hilly zone with flat terrain. The expressway road alignment passes along Bakaiya river. The espressway alignment crosses Bakaiya river and other minor rivers. The expressway road is linked with Hetauda-Dharan-Chatara highway (Ch 48+000) at Shripur village with gravel road. The gravel road is approximately one (1) Km long and connectiong expressway at Rajdamar village near Nepal Army Basecamp. The access road is approximately 1Km long with average width 4m.

 

The Employer is:

Government of Nepal, Ministry of Defence,Nepali Army, Kathamadu – Terai/Madesh – Fast Track (Expressway) Road Project,Nepali Army Headquarter, Bhadrakali, Kathmandu, Nepal

Project Hightlight

Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works, Ch: 49+800 to Ch: 57+400
  • Road
  • KTFT/ICB/Works/R&B/078/079/03
  • NPR 5,907,103,840.00
  • Prime
Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works, Ch: 49+800 to Ch: 57+400
Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works, Ch: 49+800 to Ch: 57+400